10. Creating and Sustaining a Green Environment
Here are the environmental documents relating to Local Plan 4.
- CDR10.1 Redditch Borough Council Draft Green Infrastructure Strategy Stage 1
- CDR10.2 Addendum To The Open Space Needs Assessment
- CDR10.3 Worcestershire Green Infrastructure Strategy 2013 2018
- CDR10.4 Waste Core Strategy For Worcestershire Adopted Waste Local Plan 2012 2027
- CDR10.5 Redditch Borough Council And Bromsgrove District Council Level 2 Strategic Flood Risk Assessment Final Report
- CDR10.6 Redditch Borough Council And Bromsgrove District Council Outline Water Cycle Study
- CDR10.7 Worcestershire Landscape Character Assessment Supplementary Guidance
- CDR10.8 Winyates Green Triangle Phase 1 Habitats Survey And Protected Species Survey Assessment
- CDR10.9 Playing Pitch Strategy 2011 2016
- CDR10.11 Joint Municipal Waste Management Strategy For Herefordshire And Worcestershire 2004 2034
- CDR10.12 Surface Water Management Plan Technical Guidance
- CDR10.13 River Basin Management Plan Severn District Without Annexes
- CDR10.14 Special Wildlife Site Review
- CDR10.15 Public Open Space Standards In The Borough
- CDR10.17 Addendum To The SFRA And WCS
- CDR10.19 Natural England Green Infrastructure Guidance
- CDR10.21 Worcestershire Biodiversity Action Plan By Habitat
- CDR10.22 Worcestershire County Council Renewable Energy Study
- CDR10.23 Open Space Provision Supplementary Planning Document
- CDR10.10 Renewable Energy Capacity Study for the West Midlands (2011)
- CDR10.16 Bromsgrove District and Redditch Borough Scoping Water Cycle Strategy Final Report with Appendices (February 2009)
- CDR10.18 Bromsgrove District and Redditch Borough Strategic Flood Risk Assessment, Level 1 Report and Appendices (January 2009)
- CDR10.20 Open Space Needs Assessment (2009)
- CDR10.24 GOWM Renewable energy prospectus for the West Midlands (November 2001)